DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site.
DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.


Contract Details

0000005084
Public Works ID No:
0000005084
Title:
GOLDEN GATE PARK GOLF COURSE CLUBHOUSE
Request for Bids or Qualifications/Proposals
Estimated Cost/Contract Amount:
In excess of $2,240,000.00
Due Date:
08/11/2021
Due Time:
02:30PM
Bid/Proposal Submission Location:
Bids shall be submitted online via ShareFile until 2:30:00 p.m. on August 11, 2021, after which the bid opening will be conducted live online via Microsoft Teams. Contract Administration will email the Microsoft Teams meeting information to all Plan Holders approximately 24 hours prior to Bid opening.
Duration:
270 consecutive calendar days
Project Zip Code:
Advertisement Date:
07/14/2021
Contacts
Contact Type Contact Name Contact Email
Project Manager Noah Levy Noah.Levy@sfgov.org
Local Business Enterprise (LBE) Selormey Dzikunu Selormey.Dzikunul@sfgov.org
City's Surety Bond Program City's Surety Bond Program bond@imwis.com
Pre-Bid/Pre-Proposal Conference
Location:
A pre-bid meeting will be held on Wednesday, July 28, 2021 at 10:00AM at the project site located at the Golden Gate Park Golf Course, 970 47th Avenue, San Francisco.
Date:
07/28/2021
Time:
10:00AM
Attendance:
Project Scope
Project Description
Scope of Work: The project is to construct a new one story golf clubhouse building in replacement of the previous clubhouse building which has been previously demolished above grade. The new clubhouse building consists of an open area for retail and dining, a kitchen/bar with counter seating and built in seating, a commercial prep kitchen, administrative office, and all-gender restrooms accessed from the exterior. The building is wood frame on concrete mat slab, with steel columns, glue laminated wood beams and a cross laminated timber roof deck. The building features window walls of glass and patio doors that open out to a concrete patio. A fenced in utility and service yard is located at the south side of the building. The project includes grading, paving, and planted areas to construct accessible parking spaces and new walkways and ramps connecting the clubhouse building to the existing driving cage.
Project Links
Advertisements
0000005084 Legal Notice
Bid Results
Awards
Bid Documents
DPW Electronic Bid Documents Download Site
Insurance
Insurance Type Amount
Requirements
  1. Class "B” license required to bid.
  2. On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went into effect. The program requires that all contractors and subcontractors who bid or work on a public works project register and pay an annual fee to the California Department of Industrial Relations (“DIR”).
  3. No contractor or subcontractor may be listed in a bid or awarded a contract for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
  4. This Project shall incorporate the required partnering elements for Partnering Level 2. Refer to Section 01 31 33 for more details.
  5. Pursuant to San Francisco Administrative Code (“Administrative Code”) Section 6.25 and Chapter 25 of the Environment Code, “Clean Construction” is required for the performance of all work.
  6. This Contract is subject to the requirements of Administrative Code Chapter 12X, which prohibits contracting in states with laws that allow discrimination. The City is prohibited from entering into any Contract with a Contractor that has its United States headquarters in a state on the Covered State List or where any or all of the work on the contract will be performed in any of those states on the Covered State List. Administrative Code Chapter 12X and a list of states on the Covered State List can be found at: http://sfgsa.org/chapter-12x-anti-lgbt-state-ban-list.
  7. The Specifications include liquidated damages. Contract will be on a Lump Sum Bid Items basis. Progressive payments will be made.
  8. The Contract will be awarded to the lowest responsible responsive bidder.
  9. A bid may be rejected if the City determines that any of the bid item prices are materially unbalanced to the potential detriment of the City.
  10. Bid discounts may be applied as per Administrative Code Chapter 14B. LBE Subcontracting Participation Requirement is 25%. Call Selormey Dzikunu at (628) 271-2094 for details. In accordance with Administrative Code Chapter 14B requirements, all bidders shall submit documented good faith efforts with their bids, except those who exceed the above stated LBE Subcontracting Participation Requirement by 35%. Bidders must achieve 80 out of 100 points to be deemed responsive. Bidders will receive 15 points for attending the pre-bid conference, if scheduled. Refer to CMD Form 2B.
  11. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award.
  12. In accordance with Administrative Code Chapter 6, no bid is accepted and no contract in excess of Threshold is awarded by the City and County of San Francisco until such time as the General Manager of the Recreation and Park Department recommends the contract for award, and the Recreation and Park Commission then adopts a resolution awarding the Contract. Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds.
  13. Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations. Minimum wage rates other than applicable to General Prevailing Wage must comply with Administrative Code Chapter 12P, Minimum Compensation Ordinance.
  14. Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Chapter 12B of the Administrative Code within two weeks after notification of award.
  15. If a bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the bidder shall, no later than the 10th working day prior to the date of Bid opening, provide written notice to the Contract Administration Division, San Francisco Public Works, setting forth with specificity the grounds for the objection.
  16. Right reserved to reject any or all bids and waive any minor irregularities.
Bid Documents or RFQ/P Package
  1. Digital files of Bid Documents, Plan Holders Lists, and Addenda may be downloaded at no cost from the Public Works Electronic Bid Documents Download site at www.sfpublicworks.org/biddocs.
  2. Please visit the Contracts, Bids and Payments webpage at www.sfpublicworks.org for more information (click on Resources > Contractor Resources).
  3. Notices regarding Addenda and other bid changes will be distributed by email to Plan Holders.
Events AND Resources

Back to List