DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site.
DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.


Contract Details

0000005178
Public Works ID No:
0000005178
Title:
SLOAT INFRASTRUCTURE IMPROVEMENTS
Request for Bids or Qualifications/Proposals
Estimated Cost/Contract Amount:
In excess of $218,000.00
Due Date:
12/15/2021
Due Time:
02:30PM
Bid/Proposal Submission Location:
Bids shall be submitted online via ShareFile until 2:30:00 p.m. on December 15, 2021, after which the bid opening will be conducted live online via Microsoft Teams. Contract Administration will email the Microsoft Teams meeting information to all Plan Holders approximately 24 hours prior to Bid opening.
Duration:
90 consecutive calendar days
Project Zip Code:
94116
Advertisement Date:
11/15/2021
Contacts
Contact Type Contact Name Contact Email
Project Manager Edmund Lee Edmund.Lee@sfdpw.org
Disadvantaged Business Enterprise (LBE) Selormey Dzikunu Selormey.Dzikunu@sfdpw.org
Pre-Bid/Pre-Proposal Conference
Location:
N/A
Date:
Time:
Attendance:
This project will not have a pre-bid conference.
Project Scope
Project Description
Sloat Infrastructure Improvements
Project Links
Advertisements
Bid Results
Awards
Bid Documents
DPW Electronic Bid Documents Download Site
Insurance
Insurance Type Amount
Requirements
  1. On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went into effect. The program requires that all contractors and subcontractors who bid or work on a public works project register and pay an annual fee to the California Department of Industrial Relations (“DIR”).
  2. No contractor or subcontractor may be listed in a bid or awarded a contract for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
  3. This Project shall incorporate the required partnering elements for Partnering Level 2. Refer to Section 01 31 33 for more details.
  4. Pursuant to San Francisco Administrative Code (“Administrative Code”) Section 6.25 and Chapter 25 of the Environment Code, “Clean Construction” is required for the performance of all work.
  5. The Specifications include liquidated damages. Contract will be on a Lump Sum Bid Items With Unit Prices basis. Progressive payments will be made.
  6. The Contract will be awarded to the lowest responsible responsive bidder.
  7. A quote may be rejected if the City determines that any of the bid item prices are materially unbalanced to the potential detriment of the City.
  8. Bidders are advised that this is a federal-aid project subject to equal employment opportunity provisions and Caltrans Race-Conscious Disadvantaged Business Enterprise (DBE) program. CMD Bid Discount is not applicable to this Contract. The DBE participation goal is 28%. Only Caltrans certifications can be used to calculate the DBE participation. For details, contact Selormey Dzikunu by phone at (628) 271-2094 or by email at Selormey.Dzikunu@sfdpw.org.
  9. Contractor shall perform not less than 30 percent of the original contract work with the Contractor's own organization. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Refer to the Project Manual for further instructions regarding submission requirements for bid security. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award.
  10. Class “A” license required to bid.
  11. Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations and the Federal General Prevailing Wage Determinations of the Secretary of Labor under the Copeland Act. Minimum wage rates other than applicable to General Prevailing Wage must comply with Administrative Code Chapter 12P, Minimum Compensation Ordinance.
  12. Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Chapter 12B of the Administrative Code within two weeks after notification of award.
  13. This Contract is subject to the requirements of Administrative Code Chapter 12X, which prohibits contracting in states with laws that allow discrimination. The City is prohibited from entering into any Contract with a Contractor that has its United States headquarters in a state on the Covered State List or where any or all of the work on the contract will be performed in any of those states on the Covered State List. Administrative Code Chapter 12X and a list of states on the Covered State List can be found at: http://sfgsa.org/chapter-12x-anti-lgbt-state-ban-list.
  14. Right reserved to reject any or all quotes and waive any minor irregularities.
Bid Documents or RFQ/P Package
  1. Digital files of Bid Documents, Plan Holders Lists, and Addenda may be downloaded at no cost from the Public Works Electronic Bid Documents Download site at https://bsm.sfdpw.org/ContractAdmin/Login.aspx. Please visit the Contracts, Quotes and Payments webpage at https://bidopportunities.apps.sfdpw.org for more information.
  2. Notices regarding Addenda and other bid changes will be distributed by email to Plan Holders.
Events AND Resources

Back to List